Short Story

The St. Francois Girls’ College (SFGC) was recently vandalized and are in need of support from the Alumnae.  We are seeking to raise at least $10,000USD to assist with replacing and repairing the school’s infrastructure.

 

St. Francois Girls North America Alumna

by hmclean

  • $20,000.00

    Funding Goal
  • $0.00

    Funds Raised
  • 0

    Days to go
  • Goal and Date

    Campaign End Method
Raised Percent :
0%
Minimum amount is $ Maximum amount is $ Put a valid number
$
, Trinidad and Tobago

hmclean

1 Campaigns | 0 Loved campaigns

See full bio

Campaign Story

The St. Francois Girls’ College (SFGC) was recently vandalized and are in need of support from the Alumnae.  We are seeking to raise at least $10,000USD to assist with replacing and repairing the school’s infrastructure.

 

  • $20,000.00

    Funding Goal
  • $0.00

    Funds Raised
  • 0

    Days to go
  • Goal and Date

    Campaign End Method
Raised Percent :
0%
Minimum amount is $ Maximum amount is $ Put a valid number
$
, Trinidad and Tobago

hmclean

1 Campaigns | 0 Loved campaigns

See full bio

Category:

Description

We are raising funds to support our beloved high school – St. Francois Girls’ College.  The school was affected by two break ins within one month and is in need of upgrades and repair.  Below is a note from the current principal:

At this time a number of projects of have been identified for enhancing the infrastructure of the school thereby making it more conducive to teaching and learning.

These include painting all 16 classrooms in Block B, the outer walls along Block B, the toilets, the stair cases in Block B at a cost of roughly $12,000.00. Wall at the back Music Rm at a cost of $20,000.00 to protect pans stored there and to add another layer of security to those rooms (PE & Music)

AC Units servicing, repairs and 3 units to replace at a cost of $40,450.00.

Roof on F&N around $10,000.00.

Building of Stage $20,000.00

Fixing tiles in Hall – to be done

Toilets $2000.00

Changing of lights in Hall – $2500.00

Maintenance of grounds men equipment – $5000.00

Arch above main gate – looking at it since last year but no estimate as yet, it is a tedious undertaking

Miscellaneous (Broken doors,  windows etc.) – $5000.00

Metal cages around projectors in prefab – 4 in total – $3000.00

Changing of locks on twenty rooms (security reasons) -$4000.00

These are just some of the maintenance work that must be done on the compound before school reopens. Funding at this time unknown

I am pleading for assistance from the Alumnae.

ID Name Email Amount
27963reno Smithrenosmith@bellsouth.net
27956Charmaine Betty-Singletonshortiedst1987@gmail.com
27955Emily Magalettapileggi22@hotmail.com
27951Chrisanne Roachchrisanne.roach@gmail.com
27949Jeanne Halloranjeannehalloran@gmail.com
27948Karen Gallagherkgallagher22@gmail.com
27947Gaynel Smithgaynelh@yahoo.co.uk
27946Kori Williamsonkoribaxley@gmail.com
27934Staceyann Chambers-PorteousCstaceyann@yahoo.com
27933Beverly Kimbeverly.umana@gmail.com

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.